Banner
Banner

Attention: open in a new window. PDFPrintE-mail

2009
15
Sep

PP Integration with FI , SD, MM and QM

PP-MM integration

  • Material Type: Allow material type in BOM / routing.
  • Batches: Batch search sorting.
  • MRP: PD or CBP mrp planning.

PP-QM

  • Inspection lot generation as production order is released.
  • When GR is made, material posting to inspection stock.
  • Assignment of inspection characteristics in routing.
  • Assigning inspection work center in operation for the purpose of scheduling.

PP-SD

  • Can have Sales order BOM.
  • MRP run against sales order.
  • Availability check for sale order.
  • Requirement class creation for customer requirement in Basic Function (Transfer of requirement).

PP-FICO

  • GL entry.
  • Cost element entry.
  • Production order cost in order creation n release.
  • Accounting document posting to Profit Center.
  • Product costing.
  • Settlement profile allocation to order type.
  • Work center assignment to cost center.
  • Activity type assignment.
  • Production order settlement.
Last Updated (Tuesday, 30 November 1999 00:00)
Banner
Free software downloads